1. If the proposed development would be located in any Area of Special Flood Hazard, the following must be provided:
a. The Mean Sea Level (MSL) elevation proposed for the lowest floor (including basement floor) of each proposed structure, or
b. The Mean Sea Level (MSL) elevation to which each proposed non-residential structure would be flood proofed, and certification that the proposed development would withstand the hydrostatic and hydrodynamic loading conditions of expected flood events, and
c. Determination and certification of the Base Flood Elevation (BFE), including calculations, a map (to scale) showing the Base Flood boundaries, and a grading plan with maximum topographic contour intervals of five (5) feet for any development or subdivision greater than fifty (50) lots or five (5) acres, and
d. Determination and certification that the development would not raise the Base Flood Elevation (BFE) one foot or more.
2. If the proposed development would be located in a Floodway Area, a determination and certification that the development would not result in any increase whatsoever of the Base Flood Elevation (BFE) one foot or more.